FC&A Magazine - Future Constructor & Architect

TG Escapes provide timber frame, net-zero buildings offering a highly flexible, bespoke, turnkey, architectural design and build solution to a wide range of customers.

TG Escapes

Biophilic design principles are combined with sustainable materials and the latest technology to create buildings that are beautiful, ergonomic and inspiring for their occupants whilst offering exceptional environmental integrity.

One of their more recent projects was commissioned by Brune Park Community School which is part of the Gosport and Fareham MAT.

GFM were keen on an operational net-zero solution and were impressed by TG Escapes’ understanding of their requirements. They also considered a volumetric and traditional build but the timescales didn’t suit. The 1001m2 building, completed in 26 weeks onsite, achieved an A+ EPC at minus 3 at a cost of £2.8m including demolition, temporary construction and external landscaping.

Here senior staff talk about their experience of the building.

Find out more at TG ESCAPES

Tags: , , , , , , , , , , ,

Latest Issue

Latest Issue of Public Sector Build Journal

FOLLOW US