Surface Design Show

After carrying out a fire door survey, Warwick Hospital undertook measures to protect and refurbish the fire doors, throughout their sterilisation unit, with Yeoman Shield fire-rated door protection products.

Yeoman Shield

Door edge protectors were fitted to the leading and meeting edges of the doors, and door protection panels were installed to a specified height so that it shielded the most vulnerable areas.

The colours, Blue and Red, were chosen to distinguish between the contaminated and sterile areas within the hospital unit.

Now installed, the new door protection does not affect the integrity of the fire doors, and comes with the current and relevant fire certificates.

Head over to the Yeoman Shield website for more information.

Contact Yeoman Shield

Tags: , , ,
Surface Design Show

Latest Issue

Latest Issue of Public Sector Build Journal

FOLLOW US

advertisement

Events

kbb Birmingham prepares for 2020 show

kbb Birmingham prepares for 2020 show

kbb Birmingham, Europe’s largest dedicated kitchens, bedrooms and bathrooms exhibition returns for 2020. Taking place...

December 20, 2019
Short of time for learning  and networking?

Short of time for learning and networking?

The internet provides part of the answer, of course. But the smartest solution for busy architects and specifiers is...

December 18, 2019
Promoting fire safety in the public sector at FIREX International 2019

Promoting fire safety in the public sector at FIREX International 2019

With fire safety such a critical issue, having a global hub for fire protection products, insights and thought...

December 16, 2019
Housing 2019 addresses industry challenges

Housing 2019 addresses industry challenges

Thousands of housing professionals will gather in Manchester this month for Housing 2019, the Chartered Institute of...

December 16, 2019