Surface Design Show

After carrying out a fire door survey, Warwick Hospital undertook measures to protect and refurbish the fire doors, throughout their sterilisation unit, with Yeoman Shield fire-rated door protection products.

Yeoman Shield

Corridor doors were fitted with Yeoman Shield Door Edge Protectors and PVCu clad glazing beads – both in a graphite colour.

Contrasting mid grey Door Protection Panels were installed to both sides of the doors, where vulnerable architrave and framework were also protected by Yeoman Shield products.

In addition, Yeoman Shield Guardian Handrails were fitted along the hospital passageways, with FalmouthEx Wall Protection Panels below.

Contact Yeoman Shield

Tags: , , , ,
Surface Design Show

Latest Issue

Latest Issue of Public Sector Build Journal

FOLLOW US

advertisement

Events

kbb Birmingham prepares for 2020 show

kbb Birmingham prepares for 2020 show

kbb Birmingham, Europe’s largest dedicated kitchens, bedrooms and bathrooms exhibition returns for 2020. Taking place...

December 20, 2019
Short of time for learning  and networking?

Short of time for learning and networking?

The internet provides part of the answer, of course. But the smartest solution for busy architects and specifiers is...

December 18, 2019
Promoting fire safety in the public sector at FIREX International 2019

Promoting fire safety in the public sector at FIREX International 2019

With fire safety such a critical issue, having a global hub for fire protection products, insights and thought...

December 16, 2019
Housing 2019 addresses industry challenges

Housing 2019 addresses industry challenges

Thousands of housing professionals will gather in Manchester this month for Housing 2019, the Chartered Institute of...

December 16, 2019